• 24/7 Phone Services

    9964811495

  • Visit Our Place

    Haveri- 581 110, Karnataka, INDIA

Preloader Close
Project Details

Projects Related to Road & Infrastructure Development

Bhadra Command Area Development authority

 

NAME OF WORK

Formation of Ayacut road from Sy.No.133(Vahilelshwar Patil) to Sy. No87(Hulmani Basappa) in Didaguru Village. Haveri Taluk,Haveri District.


Project Description

This project is aimed at constructing an Ayacut road between Survey No.133 and Survey No.87 in Didaguru Village. The road will serve as a key access route for farmers, ensuring better transportation of agricultural produce and resources. It will also play a critical role in rural development and improve infrastructure within the Ayacut area of Haveri Taluk.

Scope of Work

  • Survey and alignment marking between Sy.No.133 and Sy.No.87.
  • Earthwork for formation of road embankment and leveling.
  • Laying of sub-base and base layers including GSB and WBM materials.
  • Construction of side drains for efficient stormwater management.
  • Provision of culverts or cross-drainage structures if required.
  • Final grading and compaction to ensure road durability and usability.

Purpose and Benefits

  • Improved access for farmers to reach fields and nearby village roads.
  • Enhanced rural mobility for transport of goods, fertilizers, and machinery.
  • Support for year-round agricultural activities, even during the rainy season.
  • Time-saving and cost-effective logistics for the farming community.
  • Boost to the rural economy and farming productivity in Didaguru Village.

KONKAN RAILWAY CORPORATION LIMITED

 

NAME OF WORK

Repairs to Barkur Railway Station Approach Road in Karnataka State


Project Description

This project addresses the necessary repair works on the approach road to Barkur Railway Station in Karnataka. The road has deteriorated over time, causing inconvenience to commuters. The repairs aim to restore the surface, improve safety, and ensure better access to the station for both public and railway vehicles.

Scope of Work

  • Assessment of current road conditions and damaged areas.
  • Removal of broken surface and pothole filling.
  • Resurfacing with bituminous or concrete materials as needed.
  • Repairing shoulders and side drains to ensure proper runoff.
  • Road markings, signage, and side trimming.
  • Final inspection and safety checks for usability.

Purpose and Benefits

  • Improved commuter access to Barkur Railway Station.
  • Enhanced road safety and traffic flow in the approach area.
  • Reduced wear and tear on vehicles.
  • Better drainage to avoid water stagnation near the station.
  • Support for local transportation and regional infrastructure goals.

KARNATAKA PUBLIC WORKS DEPARTMENT

 

NAME OF WORK

AME to Bagalakote – Biligiriranganabetta State Highway-57 (KM 214.52 to KM 217.81), Renebennur Taluk, Karnataka

Road Improvement Project


Project Description

This road improvement initiative spans a critical section of the Biligiriranganabetta State Highway-57 from KM 214.52 to KM 217.81 in Renebennur Taluk, connecting the stretch from AME to Bagalakote. The project is undertaken to enhance connectivity, improve safety, and facilitate smoother traffic flow in this key transportation corridor of Karnataka.

Scope of Work

  • Clearing of roadside obstructions and site preparation.
  • Strengthening of road base and widening where required.
  • Asphalt resurfacing and pothole repair to ensure smooth driving surface.
  • Installation of road safety signage and markings.
  • Construction of roadside drains for effective water management.
  • Final leveling, compaction, and finishing works.

Purpose and Benefits

  • Boost transportation efficiency between AME and Bagalakote.
  • Reduce vehicle wear and tear and improve driving comfort.
  • Enhance road safety for local commuters and freight carriers.
  • Support regional development and access to nearby towns and villages.
  • Facilitate smoother movement for emergency and public service vehicles.