Project Details

Projects Related to Railway Infrastructure

KONKAN RAILWAY CORPORATION LIMITED

 

NAME OF WORK

 Renovation / Repair of RO-RO Prepaid Toilet at Surathkal Station


Project Description

This project focuses on the renovation and repair of the RO-RO prepaid toilet at Surathkal Railway Station. The objective is to improve the facility's functionality, cleanliness, and accessibility, ensuring a better experience for passengers. The repairs will address wear and tear, replace outdated fixtures, and ensure the highest standards of sanitation.

Scope of Work

  • Assessment and inspection of the existing toilet's condition.
  • Removal and disposal of old fixtures, flooring, and fittings.
  • Plumbing and electrical system repairs where necessary.
  • Installation of modern, durable sanitary fittings.
  • Re-flooring with anti-slip tiles and correcting drainage issues.
  • General painting, cleaning, and cosmetic repairs.
  • Upgrading signage and ensuring compliance with accessibility standards.
  • Ensuring minimal disruption during the repair process to station services.

Purpose and Benefits

  • Provide modern and hygienic toilet facilities for passengers at Surathkal Station.
  • Enhance the cleanliness and accessibility of public restrooms in the railway station.
  • Improve passenger satisfaction and safety through better sanitation standards.
  • Reduce the impact of operational issues caused by outdated infrastructure.
  • Support the ongoing development and modernization of railway facilities in the region.

KONKAN RAILWAY CORPORATION LIMITED

 

NAME OF WORK

 Manual Cutting/Trimming of Trees along the Track Likely to Obstruct OHE under SSE/P.Way/Karwar Section


Project Description

This project focuses on the manual cutting and trimming of trees along the tracks in the SSE/P.Way/Karwar Section, which could obstruct the Overhead Electrification (OHE) system. The goal is to prevent potential interference with electrical infrastructure and ensure safe, uninterrupted train operations by maintaining a clear and hazard-free track environment.

Scope of Work

  • Survey and identification of trees that could obstruct OHE cables.
  • Manual cutting, trimming, and pruning of trees and branches.
  • Safe removal and disposal of tree debris and cuttings.
  • Ensuring the clearance area meets necessary safety standards.
  • Maintaining the right-of-way and preventing future obstructions.
  • Implementation of safety measures during the cutting and trimming process.

Purpose and Benefits

  • Prevent electrical hazards and interference with the OHE system.
  • Maintain continuous and safe train operations by eliminating tree-related obstructions.
  • Enhance the efficiency and reliability of the Overhead Electrification system.
  • Reduce the risk of future operational disruptions and costly repairs.
  • Support the overall safety and sustainability of the railway network.

KONKAN RAILWAY CORPORATION LIMITED

 

NAME OF WORK

 Cutting of Trees Obstructing to OHE Line in Station Yard from Pernem to Loliem in Goa State


Project Description

This project involves cutting and removing trees that obstruct the Overhead Electrification (OHE) line in the station yard between Pernem and Loliem in Goa State. The aim is to prevent interference with the OHE system, ensuring the safety and uninterrupted operation of railway services in the area.

Scope of Work

  • Surveying and identifying trees and branches obstructing OHE lines.
  • Cutting, trimming, and removing trees, branches, and other obstructions.
  • Safe disposal of tree cuttings and debris, keeping the area clear.
  • Pruning overgrown foliage to ensure proper clearance from the OHE system.
  • Ensuring proper safety measures during the work, including fencing and warning signs.
  • Coordinating with local authorities for environmental compliance and minimal ecosystem disruption.

Purpose and Benefits

  • Prevent electrical disruptions and ensure the OHE line remains operational.
  • Maintain uninterrupted and safe train services between Pernem and Loliem.
  • Minimize the risk of damage to the OHE system from tree branches and falling foliage.
  • Improve the overall safety of railway operations and prevent accidents.
  • Support sustainable environmental management practices in the region.

KONKAN RAILWAY CORPORATION LIMITED

 

NAME OF WORK

 Cutting of Trees Obstructing OHE Line in Station Yard from Kundapura to Thokur in Karnataka State


Project Description

This project involves the cutting and trimming of trees and vegetation that obstruct the Overhead Electrification (OHE) line in the station yard from Kundapura to Thokur. The work aims to clear any potential hazards to the OHE system, ensuring safe and uninterrupted train operations.

Scope of Work

  • Survey and identification of trees and branches that pose a risk to the OHE line.
  • Manual cutting and trimming of obstructing trees, branches, and vegetation.
  • Safe disposal of tree cuttings and debris to maintain a clean environment.
  • Ensuring proper clearance around the OHE line to prevent future obstructions.
  • Implementing safety measures including worksite barricades and warning signs.
  • Coordination with local authorities for environmental compliance and minimal impact.

Purpose and Benefits

  • Prevent interference with the OHE line and ensure safe electrical operations.
  • Ensure uninterrupted and safe railway services between Kundapura and Thokur.
  • Reduce the risk of operational disruptions caused by tree-related hazards.
  • Maintain the longevity and effectiveness of the OHE system.
  • Improve overall safety for both passengers and railway staff by eliminating obstructions.

KONKAN RAILWAY CORPORATION LIMITED

 

NAME OF WORK

Casting & Fixing of damaged and missing Drain slab in Tunnels under SSE/P.way/ KAWR Section.


Project Description

This project focuses on repairing and replacing damaged or missing drain slabs in tunnels maintained by the SSE/P.Way/KAWR section. These slabs are essential for maintaining proper drainage inside tunnels and preventing structural issues caused by water ingress. The work ensures improved drainage and enhanced railway safety.

Scope of Work

  • Inspection and documentation of defective or missing slabs inside tunnels.
  • Breaking and clearing damaged concrete structures.
  • Casting of new RCC drain slabs to required standards.
  • Transportation and safe installation of the slabs in tunnel drains.
  • Ensuring proper fitting, alignment, and sealing of installed slabs.
  • Implementation of safety measures during tunnel-based construction activities.

Purpose and Benefits

  • Improves tunnel drainage functionality and safety.
  • Prevents erosion and water-related damage to railway tracks and infrastructure.
  • Minimizes risks to rail operations and enhances structural integrity.
  • Supports the long-term health of the railway drainage system in the KAWR section.
  • Maintains operational efficiency and reduces emergency maintenance needs.

Completed Projects

We are proud to showcase our recently completed projects within the Karwar Division, Konkan Railway Corporation Ltd. The work was executed under the supervision of the Office of Senior Regional Engineer, 2nd Floor Railway Station Building, Shirward, Karwar, Karnataka, India (PIN: 581306).

Project Details: Shotcreting and Weep Hole Installation

This project involved essential maintenance and stabilization works in the Canacona & Loliem sections under the SSE/W/MAO jurisdiction in Goa.

Shotcreting Gabion Face of Platform

  • Application: Shotcreting was performed on the gabion face of the platform and in cutting/tunnels for stabilization and surface protection.
  • Material: Grade cement concrete was used, incorporating synthetic polyester fibre for enhanced strength and durability.
  • Thickness: Applied to a uniform thickness in a single layer.
  • Process: Included thorough cleaning of the rock surface with water under pressure prior to application, utilizing specialized shotcreting machine, compressor, concrete mixer, scaffolding, and covering all materials, equipment, labour, and logistics.

Drilling of Weep Holes

  • Purpose: Installation of weep holes to relieve hydrostatic pressure behind the shotcrete or rock face, ensuring long-term stability.
  • Specifications: Diameter up to a maximum (site-dependent), Depth as required.
  • Location: Installed at indicated locations in the cutting/shotcreting area.
  • Process: Included all necessary drilling machines, materials, scaffolding, and labour, executed as directed by the Engineer-in-charge.

Client & Project Info

Client/Authority: Konkan Railway Corporation Ltd.

Division: Karwar Division

Location: Canacona & Loliem, Goa (under SSE/W/MAO section)

Completion: Successfully completed as per specifications and direction of the Engineer-in-charge.

Completed Projects: Railway Infrastructure Stabilization & Restoration 🚧

We are pleased to present a comprehensive overview of the civil engineering works recently completed for the Konkan Railway Corporation Ltd., Karwar Division. The projects were executed under the supervision of the Senior Regional Engineer's Office in Karwar, Karnataka (PIN: 581306).

Project Authority & Location

Client: Konkan Railway Corporation Ltd.

Division: KARWAR-DIVISION ENGINEERING

Office: OFFICE OF SENIOR REGIONAL ENGINEER, 2ND FLOOR RAILWAY STATION BUILDING, SHIRWARD, KARWAR, KARNATAKA, 581306, India.

Schedule 01 - Schedule A: Goa Section Works

Essential stabilization and drainage works in the Canacona & Loliem sections under the SSE/W/MAO jurisdiction in Goa.

Stabilization & Drainage

  • Shotcreting (Reinforced): 50 mm thick layer of M25 grade cement concrete with synthetic polyester fibre on the Gabion face of platform and in cuttings/tunnels.
  • Weep Hole Drilling: Up to 38 mm diameter, 0.30 m deep holes drilled in shotcreting/rock to relieve hydrostatic pressure.

Schedule 02 - Schedule B: Karnataka Section Works

Platform stabilization, surface restoration, and concrete element replacement between the Asnoti and Kumta stations under the SSE/W/KW section in Karnataka State.

Platform & Surface Restoration

  • Platform Restoration: Shotcreting of the Gabion face of the platform and replacing damaged Pre-Cast coping slabs and paving slabs.
  • Pre-Cast Element Fixing: Fixing preccast cement concrete elements (e.g., copings) made of 1:1.5:3 concrete set using 1:3 cement mortar.
  • Reinforcement & Dismantling: Installation of Mild and Medium Tensile steel bars for RCC work and dismantling precast slabs (40–75 mm thick).