Providing Water Pipeline to Bagalakote–Biligiriranganabetta SH-57 (Km 218.07 to Km 219.90) in Ranebennur Taluk
Project Description
This project involves the provision and installation of a new water pipeline system along a designated section of the State Highway-57 (SH-57), specifically from kilometer 218.07 to kilometer 219.90, passing through Ranebennur Taluk. The main objective is to enhance the water supply infrastructure in this area to support the local population and improve access to clean and reliable water.
Scope of Work
Surveying the proposed pipeline route to assess the geographical and technical feasibility.
Excavation and trenching along the roadside within the specified SH-57 segment.
Laying of water supply pipelines, including jointing, bedding, and backfilling.
Provision of necessary fittings, valves, and chambers to ensure functional and operational flexibility.
Ensuring all works are carried out as per relevant engineering standards and safety protocols.
Restoration of road and surrounding areas post pipeline installation.
Testing and commissioning of the pipeline to ensure leak-proof and smooth water flow.
Purpose and Benefits
To improve water accessibility for nearby residential areas, agricultural lands, and public facilities.
To support socio-economic development in Ranebennur Taluk by ensuring a stable water supply.
To contribute to the broader goal of infrastructure development in Karnataka through reliable utility services.
Karnataka Neeravari Nigam Limited
NAME OF WORK
Name of work: Removal of silt in main canal in Basapur Lift Irrigation Scheme Stage -1in Hanagal taluk, Haveri District
Project Description
This project involves the removal of silt from the main canal of the Basapur Lift Irrigation Scheme Stage-1, located in Hanagal Taluk, Haveri District. The objective is to restore the canal’s full operational capacity, ensuring efficient water delivery for agricultural use. The accumulation of silt reduces flow efficiency and can lead to water management issues, making timely desilting essential for irrigation sustainability.
Scope of Work
Survey and assessment of silt deposition along the canal route.
Mechanical and manual desilting operations using excavators and laborers.
Transportation and proper disposal of excavated silt.
Minor repair work along damaged canal sections if necessary.
Reshaping and regrading of the canal bed and side walls.
Post-cleaning inspection and water flow monitoring.
Purpose and Benefits
Restoration of canal's original water-carrying capacity.
Improved irrigation efficiency across agricultural fields.
Reduced chances of water stagnation, seepage, or flooding.
Better water distribution to farmers relying on the lift irrigation scheme.
Support for agricultural productivity and rural livelihoods in Hanagal Taluk.